Its prime location enables seamless and efficient management.

Large-scale cargo operations. AGS Port Tampa successfully handled the largest steel vessel ever to enter Port of Tampa, showcasing capabilities and operational excellence.

Our Services


Professional loading and unloading services for bulk, breakbulk, and project cargo, ensuring efficiency, safety, and care at every operation.

Reliable inland transportation connecting ports, warehouses, and clients through an integrated trucking network across key regions.

Comprehensive cargo management for large, heavy, or unpackaged goods, supported by specialized equipment and trained personnel.

Tailored advisory services to optimize supply chains, streamline operations, and improve logistics performance across markets.

Secure berthing facilities for vessel maintenance, inspection, or idle time, providing flexibility and accessibility for ship operators.

Secure storage and customs-controlled facilities that optimize import and export operations. Our upcoming Foreign Trade Zone (FTZ) provides tax and duty advantages, enhancing efficiency and flexibility for global trade.

Berth 150

Characteristics


Lay-Down Area

16 acres of concrete open area.

Draft Alongside

39' Channel Restricted (42' alongside).

Truck Load-out

On site scale Private Non-TWIC Access Facility 24/7 service availability.

Berth Length

1,440 ft.

At APT, experience drives performance, ensuring every shipment is managed safely, on time, and with excellence in every move.

warehouses

Specifications


Surface

500’x125’ 62,000 sqft warehouse.

Fire Suppression System

Certified fire suppression system.

Internal Height

46’ clear-span structure, column-free design.

Connect with AGS

Our global team is ready to assist you with efficient, secure, and integrated logistics solutions.

Contact Us

Privacy Preference Center